Dapeng laser specializing in R&D, manufacturing fiber laser marking machine, industrial laser welding machines and laser sheet cutting machine, we also provides Laser sources and spare parts to the laser machine manufacturers in China and surrounding countries.
Dapeng laser specializing in R&D, manufacturing fiber laser marking machine, industrial laser welding machines and laser sheet cutting machine, we also provides Laser sources and spare parts to the laser machine manufacturers in China and surrounding countries.
Availability: | |
---|---|
Quantity: | |
FX-LD-
DAPENG
automatic rivet machine automatic blind riveting system for high-strength blind rivets
High Procesion Automatic Feeding Pneumatic Riveter Blind Rivet Machine
Product Parameter
Model | Dimensions | 440*350*420mm | |
Gross weight | 45KG | Total power | 350w |
Loading capacity | 2400Pcs(Φ3.2) 1500Pcs(Φ4.0) 1000Pcs(Φ4.8) | Feeding tube | 1.5-2m |
Blow pressure | 0.5~0.8MPa | Maximum operating radius | 2.4m |
Maximum feeding efficiency | 50-60PCS/min | Rivet diameter | 3.2mm, 4.0mm, 4.8mm |
Air supply | 0.5~0.8MPa | Power supply | 100 ~ 240VAC,50/60Hz |
Safety precautions:
1. Ensure the machine power AC 220V ( single phase).
2. Ensure the machine power already connected ground, avoid electric shock.
3. Do not open the machine power before the rivet pipe not connect to the rivet gun, otherwise the rivet pipe may shoot rivet to hurt person.
4. Prohibit to pull out rivet pipe when not turn off machine power, otherwise the rivet pipe may shoot rivet to hurt person.
5. Prohibit to block nailer by hand or others during machine running, it may hurt hand or damage machine.
6. Prohibit to agitated vibration disk by hand or others during machine running, it may affect the stabilize of vibration disk.
7. Prohibit to block the movement of rivet cylinder by hand or others, it may affect accuracy or damage cylinder.
Installation instruction:
1. Put the machine on horizontal floor or stable platform.
2. Connect the delivery pipe, one end is inserted into the exit of the main rivet outlet, and the other end is inserted into the rivet mouth of the riveter.
3. Insert the gas cylinder and signal line of the cylinder into the corresponding positions of the main engine, and insert the other end into the interface of the cylinder connector and the signal cable of the riveting gun.
4. Insert one end of the riveting gun trachea into the main air joint and the other end into the air inlet of the riveter.
5. Connect power and air pressure, machine installation is finished.
Installation notice:
1. Must follow the installation step as above .
2. Ensure the power is 220V, before connect the machine power.
3. Ensure the main machine platform is stabilize.
4. Ensure the air compressor pipe no water inside, it may affect machine use life.
5. After connecting the gas source, the cylinder on the riveting gun should be in a retracted state, otherwise it will cause a failure of the pull-out rivet, and the direction of the gas inlet and outlet should be reversed so that the cylinder on the riveting gun is in a retracted state.
Use instructions:
1. Turn on machine power, connect the air source.
2. Put the rivets into vibration plate, it is suitable under 5000pcs.
3. Prior to the first operation, a pull rivet was delivered to the pull gun nozzle for waiting operation.
4. When the first time the nail is pulled, the trigger on the riveter is pulled and the machine will run once, but a pull rivet will not be delivered to the nozzle of the riveter. Once the trigger on the riveter is pulled, the machine will deliver a pull rivet to the nozzle of the riveter.
5. After ensuring that there is a pull rivet on the gun mouth of the riveter, hold a hand-pulled nail gun to hold the workpiece to be pulled in one hand and align the pull hole to perform the pull nail operation.
6. Each pull a good pull rivets, the machine will automatically send a rivet pull rivet gun nozzle, wait for the next pull operation.
Pulling nail gun:
1. Handle the nail gun with care and do not place it randomly to avoid damaging important components such as the cylinder.
2. During installation, follow the operating sequence and connect the air pipe, nail feeding tube, and sensing wire one by one for the normal use of the gun.
3. After using the nail pulling gun for a period of time, it is necessary to change the oil and maintain it for long-term use.
Machine:
1. Standard configuration: Rated voltage: 220V/Working air pressure: 5-6kg/Rated air pressure: 2-3kg.
2. When working, ensure that the workbench is flat.
When connecting the induction line, the machine must be in a shutdown state and be careful not to operate with power on.
4. When the machine is running, lock the foot brake to prevent it from easily moving and affecting production progress.
automatic rivet machine automatic blind riveting system for high-strength blind rivets
High Procesion Automatic Feeding Pneumatic Riveter Blind Rivet Machine
Product Parameter
Model | Dimensions | 440*350*420mm | |
Gross weight | 45KG | Total power | 350w |
Loading capacity | 2400Pcs(Φ3.2) 1500Pcs(Φ4.0) 1000Pcs(Φ4.8) | Feeding tube | 1.5-2m |
Blow pressure | 0.5~0.8MPa | Maximum operating radius | 2.4m |
Maximum feeding efficiency | 50-60PCS/min | Rivet diameter | 3.2mm, 4.0mm, 4.8mm |
Air supply | 0.5~0.8MPa | Power supply | 100 ~ 240VAC,50/60Hz |
Safety precautions:
1. Ensure the machine power AC 220V ( single phase).
2. Ensure the machine power already connected ground, avoid electric shock.
3. Do not open the machine power before the rivet pipe not connect to the rivet gun, otherwise the rivet pipe may shoot rivet to hurt person.
4. Prohibit to pull out rivet pipe when not turn off machine power, otherwise the rivet pipe may shoot rivet to hurt person.
5. Prohibit to block nailer by hand or others during machine running, it may hurt hand or damage machine.
6. Prohibit to agitated vibration disk by hand or others during machine running, it may affect the stabilize of vibration disk.
7. Prohibit to block the movement of rivet cylinder by hand or others, it may affect accuracy or damage cylinder.
Installation instruction:
1. Put the machine on horizontal floor or stable platform.
2. Connect the delivery pipe, one end is inserted into the exit of the main rivet outlet, and the other end is inserted into the rivet mouth of the riveter.
3. Insert the gas cylinder and signal line of the cylinder into the corresponding positions of the main engine, and insert the other end into the interface of the cylinder connector and the signal cable of the riveting gun.
4. Insert one end of the riveting gun trachea into the main air joint and the other end into the air inlet of the riveter.
5. Connect power and air pressure, machine installation is finished.
Installation notice:
1. Must follow the installation step as above .
2. Ensure the power is 220V, before connect the machine power.
3. Ensure the main machine platform is stabilize.
4. Ensure the air compressor pipe no water inside, it may affect machine use life.
5. After connecting the gas source, the cylinder on the riveting gun should be in a retracted state, otherwise it will cause a failure of the pull-out rivet, and the direction of the gas inlet and outlet should be reversed so that the cylinder on the riveting gun is in a retracted state.
Use instructions:
1. Turn on machine power, connect the air source.
2. Put the rivets into vibration plate, it is suitable under 5000pcs.
3. Prior to the first operation, a pull rivet was delivered to the pull gun nozzle for waiting operation.
4. When the first time the nail is pulled, the trigger on the riveter is pulled and the machine will run once, but a pull rivet will not be delivered to the nozzle of the riveter. Once the trigger on the riveter is pulled, the machine will deliver a pull rivet to the nozzle of the riveter.
5. After ensuring that there is a pull rivet on the gun mouth of the riveter, hold a hand-pulled nail gun to hold the workpiece to be pulled in one hand and align the pull hole to perform the pull nail operation.
6. Each pull a good pull rivets, the machine will automatically send a rivet pull rivet gun nozzle, wait for the next pull operation.
Pulling nail gun:
1. Handle the nail gun with care and do not place it randomly to avoid damaging important components such as the cylinder.
2. During installation, follow the operating sequence and connect the air pipe, nail feeding tube, and sensing wire one by one for the normal use of the gun.
3. After using the nail pulling gun for a period of time, it is necessary to change the oil and maintain it for long-term use.
Machine:
1. Standard configuration: Rated voltage: 220V/Working air pressure: 5-6kg/Rated air pressure: 2-3kg.
2. When working, ensure that the workbench is flat.
When connecting the induction line, the machine must be in a shutdown state and be careful not to operate with power on.
4. When the machine is running, lock the foot brake to prevent it from easily moving and affecting production progress.